A Guide to Composite Metal Deck in Construction of Concrete Floor Slabs.

2023-03-29 13:22:50 By : Mr. Boss Huang
Composite metal deck is a vital component in modern construction projects, especially in the creation of composite concrete floor slabs. It is a prefabricated steel deck that speeds up the construction process, providing a stable platform for concrete pouring and reinforcement.

Raised floor construction, a technique widely used in commercial buildings and data centers, is based on composite metal deck. The composite deck is ideal for raised floor construction due to its strength, durability, and versatility. Additionally, composite metal deck is easy to install, which significantly reduces construction time and cost.
What is Composite Metal Deck - A Guide - <a href='/raised-floor/'>Raised Floor</a>


So, what is composite metal deck, and how is it used in raised floor construction?

Composite metal deck is a steel deck with a ribbed profile, typically made of galvanized steel, stainless steel, or aluminum. It comes in various sizes and thicknesses, depending on the load requirements of the project. The metal deck is manufactured in a coil and cut to length, ensuring minimum waste and maximum efficiency.

In raised floor construction, the metal deck is placed on the structural steel framing and secured with welded studs, screws, or shot pins. Once the metal deck is securely fastened, workers proceed to add reinforcement and pour the concrete to create the composite concrete floor slab.

Raised floor construction detail involves several critical steps to ensure the floor meets the required standards. The first step is to prepare the structural steel framing, which provides the support to the metal deck and the concrete slab. The framing must be level and free of defects, such as rust or damage, that could compromise the integrity of the floor.

The second step is to install the composite metal deck, which requires care to ensure it is level and correctly fastened. The studs, screws, or shot pins used to secure the metal deck must be precisely located to provide maximum support and prevent movement during the concrete pouring stage.

The third step involves adding reinforcement to the metal deck. Reinforcement includes steel bars or welded wire mesh, which is placed according to the structural engineer's specifications. Reinforcement is critical in ensuring the composite concrete floor slab is strong and can support the intended load.

The fourth and final step is to pour the concrete into the metal deck, which is then leveled and smoothed to achieve the required finish. The concrete is left to cure, usually for at least 28 days, before the raised floor can be installed.

In conclusion, composite metal deck is an essential component in raised floor construction. Its strength, durability, and versatility make it an ideal choice for creating composite concrete floor slabs that can support the required loads while reducing construction time and cost. The raised floor construction detail involves several critical steps that must be followed to ensure the floor meets the required standards, providing a stable and functional workspace.